A Leclerc supermarket in Vendôme has transformed its parking lot into a renewable energy hub. We, in collaboration with out partners, installed photovoltaic canopies over 241 parking spaces, covering 3,621 square meters. These structures protect vehicles while generating 856,354 kWh of green electricity annually. The power is used directly by the store, reducing reliance on the grid and cutting carbon emissions, a practical step toward energy independence.
After 15 months of construction, the parking lot transformation of Leclerc Sud La Roche-Sur-Yon is complete. Key accomplishments include 8,000 m² of solar panels, 13,000 new plantings, 10 electric vehicle charging stations, and 1,200 parking spaces—all with redesigned pedestrian and cycle access for smoother, safer flow. The result is a modern, fully vegetated parking environment that prioritizes convenience and sustainability.
Under construction..
Tajikistan’s largest renewable energy project is officially underway.
Two utility-scale solar plants; one in Asht, one in Jayhun, will be completed by the end of 2026. Together, they’ll deliver 500 MW of clean energy, backed by a $250 million investment.
Once live, the project will help ease winter power shortages and strengthen the country’s energy independence. A big step forward for the country’s renewable transition.
We're thrilled to announce our collaboration on the groundbreaking Nur Bukhara Solar + BESS project, Central Asia's first utility-scale hybrid. With 250 MW of solar and 63 MW/126 MWh of storage, this milestone is now powering 55k homes in Uzbekistan. Inaugurated in December 2025, it sets a new standard for clean, reliable energy in the region. Proud to be part of this transformative journey with Masdar and our local partners.
We're proud to have collaborated on the Nukus II Wind + BESS project during its critical development phase. Located in Karakalpakstan, this 200 MW wind farm paired with 100 MWh of storage is set to become Central Asia's first utility-scale wind+battery hybrid. With strong backing from ACWA Power, ADB, and others, the project moved to financial close in September 2025 and is now under construction. Our contribution helped shape its early technical and regulatory framework, paving the way for 728 GWh of clean energy annually.
A 22 MW wind project delivered through a 6-turbine layout in northern France. The project was awarded capacity under the 2023 CRE tender scheme and reached commissioning in 2025. It adds steady onshore wind generation to one of France’s most active wind regions. Our involvement focused on supporting development alignment and execution readiness through to commissioning.
The 29 MW wind farm, made up of 8 turbines, represents one of the larger assets in the 2025 commissioning cycle. Secured through the 2023 CRE auctions and brought online in 2025, it plays a key role in scaling regional capacity. Our contribution centered on coordinating development and technical workstreams to enable a smooth transition into construction and operation.
A 19 MW extension to an existing wind site, adding 4 turbines to an operational asset. The additional capacity was awarded in 2023 and integrated into the site in 2025. This expansion strengthens output without requiring full greenfield development. We supported the technical and regulatory alignment needed to deliver the extension and reach commissioning.
Our collaboration on some exciting hybrid projects (Solar+BESS & Wind+BESS) across France, Portugal, and Spain are appearing here soon. Stay tuned!!!